Water treatment · Pakistan

Commercial & industrial RO plants in Pakistan.

Need an RO plant for your business, factory or water reuse project? Aquenvia helps define the capacity, pretreatment and equipment package around your water source and intended use.

500 LPH · 1,000 LPH · 2,000 LPH · Larger systems

Tell us the output you need. Final capacity and configuration follow a feed-water review.

Not sure which size? View the capacity guide ↓
Based in LahoreEnquiries across PakistanEquipment & installation scope

Choose the right output

How much treated water do you need?

LPH means litres per hour of treated water. Start with your daily demand and operating hours, then allow for peak use, cleaning and downtime.

*Illustrative arithmetic at the stated hourly output, not a guaranteed daily production figure or a stock listing. Actual output depends on the selected design, feed-water conditions and operating time.

“1,000 litres” can mean three different things.

A 1,000 litre tank stores water. A 1,000 litre/day plant produces that volume over a day. A 1,000 litre/hour plant describes an hourly production rate. Tell us which you mean so we quote the right system.

RO plant price in Pakistan

Compare the complete package.

Two plants labelled “1,000 LPH” can have very different prices. Water quality, membrane and pump selection, controls, pretreatment and installation scope all affect the quotation.

Send your city, required output and water source. We’ll discuss the requirement and prepare a quotation in PKR against an agreed scope.

Request project pricing

What the quotation should make clear

  • Design basisTreated-water output, feed analysis, target water quality, operating hours and recovery.
  • Equipment & pretreatmentMembrane and pump make/model, filtration, dosing, instruments, controls and cleaning provision.
  • Site work & deliveryFreight, tanks, pipework, electrical work, installation and commissioning, with inclusions and exclusions.
  • Commercial termsTaxes, payment terms, availability, delivery schedule, warranty coverage and initial spares.

Equipment is selected and sourced for the agreed duty. Brand, stock and delivery commitments are confirmed in the proposal.

Designed around the water use

From commercial supply to industrial reuse.

The required water quality comes first. Share what the water will be used for, not just the capacity of the plant.

01

Commercial water treatment

Water filtration businesses, offices, hotels and other commercial premises. Define demand, feed source, hygienic storage and any disinfection requirements.

02

Factory & process water

Process water and boiler or utility make-up where reduced dissolved salts are needed. Match the treatment train to the end-use specification.

03

Treated-water reuse

RO downstream of suitable ETP or STP treatment where the reuse target requires lower dissolved salts. Include pretreatment and a practical concentrate route.

The complete treatment train

RO is one part of a working water system.

Reverse osmosis separates feed water into treated water (permeate) and concentrated reject. Plan for both streams.

  1. 01

    Test the source

    Identify feed chemistry, temperature, variability and the quality required at the point of use.

  2. 02

    Prepare the feed

    Select filtration, scale control and other pretreatment around the analysis and membrane limits.

  3. 03

    Separate with RO

    Agree product flow, recovery, pressure, monitoring and cleaning requirements.

  4. 04

    Store & distribute

    Confirm any post-treatment, disinfection, storage and delivery requirements for the intended use.

Illustrative water balance

Account for the reject water too.

At an assumed 50% recovery, producing 1,000 litres/hour of treated water requires 2,000 litres/hour of feed and creates 1,000 litres/hour of concentrate.

50% is an example, not a recommended recovery setting. The final recovery follows the feed analysis and membrane design. Pretreatment backwash and cleaning can require additional water. Confirm how concentrate will be managed at your site.

Qualify the feed before comparing prices

A TDS reading is a starting point, not an RO design.

Feed source, fouling tendency, temperature, required product quality and operating pattern affect membrane selection, flux, recovery and pretreatment. A representative analysis helps avoid comparing packages built on different assumptions.

Bore or groundwater

Provide pH, conductivity or TDS, temperature, hardness, alkalinity, calcium, magnesium, sulphate, chloride, silica, iron and manganese. These results help assess scaling and oxidation risks and whether softening, filtration or chemical control needs evaluation.

Municipal or tanker supply

Describe the actual source and storage arrangement. Check variability, turbidity, hardness, alkalinity and residual disinfectant. A tanker or blended supply may change, so one handheld TDS reading should not be treated as a fixed design basis.

Treated ETP or STP water

Confirm stable upstream treatment and assess turbidity, silt density index, organics, microbiological activity, oil and grease, and dissolved salts. RO does not replace biological treatment, and conventional media filtration may not be enough for a variable reuse feed.

Existing RO plant

Record feed, product and reject flows; conductivity or TDS; feed and stage pressures; temperature; pressure drop; cleaning history; membrane age and any chemical doses. A trend is more useful than one reading when diagnosing lost output or rising salt passage.

Minimum quotation basis

Ask every supplier to state the same inputs.

This makes capital scope, operating demand and performance conditions easier to compare.

  • Required product dutyProduct flow, daily demand, operating hours, peak requirement and intended end use.
  • Feed evidenceSource, analysis date, seasonal temperature range, full ionic results where scaling matters, turbidity and SDI where fouling matters.
  • Performance basisFeed and product quality, recovery, reject flow, membrane design conditions, instruments and acceptance readings.
  • Operating boundaryPretreatment, chemicals, cleaning system, tanks, power, drains, concentrate route, operator duties and excluded site work.

The exact test list depends on the source and use. Aquenvia’s initial review can identify missing design inputs, but laboratory sampling and testing are a separate project requirement unless a proposal explicitly includes them.

A useful first conversation

Have a water report? Send it with your enquiry.

You do not need every answer to get started. A recent analysis helps us move from a general enquiry to a defined equipment duty.

Share your report on WhatsApp

Attach the report or plant photos after the chat opens.

  • Water source & qualitySource, analysis date, TDS or conductivity, pH, temperature, hardness, alkalinity and source-specific scaling or fouling results.
  • Output & end useLitres/hour or daily demand, operating hours and how the water will be used.
  • Site & utilitiesCity, available space, power supply, feed storage and reject-water route.
  • New or existing plantRequired scope and timing, or nameplate photos and current performance.

Already have an RO plant?

Low output, rising TDS or frequent membrane changes?

Share the feed and product TDS, flow and pressure readings, membrane age and photos of the plant. We can discuss troubleshooting, pretreatment improvements, replacement equipment and maintenance scope.

Explore upgrades & maintenance

Look beyond the purchase price

Compare power and feed-water demand, filter and chemical consumption, membrane replacement, cleaning, servicing and reject management. Ask proposals to state their assumptions so operating costs can be compared on the same basis.

Before you enquire

RO plant questions, answered.

What is the price of an RO plant in Pakistan?

A useful price needs a defined capacity, feed-water quality and package scope. A 1,000 litre/hour system for one water source may need different pretreatment, membranes or pumps from another. Send your city, water use and required output for a project-specific quotation in PKR. Manufacturer, availability, delivery, warranty, taxes and installation are confirmed in the proposal.

Can I enquire about a 500 or 1,000 litre RO plant?

Yes. Tell us whether you mean 500 or 1,000 litres per hour, per day, or a storage tank size. Plant production and tank volume are different. If you do not know the hourly output, share your daily water requirement and the hours available to run the plant.

Do I need a water test before asking for a quote?

You can make the first enquiry without one. Share the source and any TDS reading you have. A water analysis is needed to confirm equipment selection and the performance basis. TDS alone does not describe hardness, scaling potential, fouling or microbiological quality.

Why can’t RO recovery be selected from TDS alone?

Recovery controls how much feed becomes treated water and how concentrated the reject stream becomes. TDS is only a combined reading. Hardness, alkalinity, sulphate, silica, iron, manganese, temperature and other constituents can limit recovery through scaling or fouling. The recovery basis should follow a representative analysis, membrane design and the site’s concentrate route.

Can RO treat bore water or salty water?

RO can be considered for reducing dissolved salts in suitably pretreated water. The appropriate membranes, pressure and pretreatment depend on the actual water chemistry and required product quality. Highly saline water needs a different design from ordinary brackish feed. Send an analysis before comparing packages.

Can I use the treated water for drinking or a water filtration business?

Tell us this at the start so the complete treatment, disinfection, storage and distribution arrangement can be considered. A low TDS reading alone does not establish drinking-water safety. Finished water needs testing against the applicable drinking-water requirements, with any required licensing confirmed for the intended business.

Can RO be used after an ETP or STP?

It can be part of an engineered reuse system after suitable upstream treatment and membrane pretreatment. It is not a substitute for treating raw sewage or industrial effluent. Confirm the reuse-water target, feed variability, fouling control and concentrate disposal route before selecting the RO package.

Do you handle installation, maintenance and RO plant upgrades?

Aquenvia can discuss equipment sourcing, pretreatment, installation, commissioning and maintenance as part of the agreed project scope. For an existing plant, send the nameplate, photos, flow and TDS readings, and the problem you are seeing. The quotation will state which services and spare parts are included.

Can I request a quotation outside Lahore?

Yes. Aquenvia is based in Lahore and accepts project enquiries across Pakistan, including Karachi, Islamabad, Rawalpindi, Faisalabad, Multan and other cities. Delivery, site attendance and commissioning arrangements are confirmed for your location in the proposal.

Aquenvia · Lahore, Pakistan

Let’s define the right RO plant for your site.

Start with your city, intended water use and required capacity. We can work through the missing information together.

Request an RO quote Or call 0325 7588341
WhatsApp