Preliminary treatment

Screening & headworks in Pakistan

Remove rags, plastics and coarse solids before they reach pumps, biological tanks or membranes. Choose screens around peak flow, channel hydraulics and the downstream equipment that needs protection.

Planning a project in Pakistan

For housing STPs in Lahore and mixed industrial drains, assess the actual rag, plastic and fibre load. Where stormwater can enter the sewer, check the peak hydraulic condition and a safe maintenance bypass. Specify how screenings will be washed, collected and removed from the site.

Start with these design inputs

  • Peak flow and upstream / downstream channel levels
  • Required opening and downstream protection duty
  • Screenings handling, access and standby arrangements

Equipment in this category

9 families

Supply and integration

Share your equipment duty, site location and any existing drawings or specifications. The proposal will identify the selected equipment, supply scope, installation interfaces, performance basis, spare parts and delivery conditions.

Explore related treatment services
WhatsApp