Planning a project in Pakistan
For Pakistan sites with limited installation space, check transport access, crane access and assembly requirements early. Chemical compatibility, outdoor temperature and the foundation design influence the tank material. Brownfield installations also need verified tie-in dimensions and a plan for keeping the existing treatment process operating.
Start with these design inputs
- Working volume, liquid properties and design conditions
- Foundation, anchorage, transport and erection constraints
- Connections, access, containment and maintenance clearances
Equipment in this category
6 familiesFRP / GRP process tanks
Reinforced tanks use service-specific resin and structural designs for compatible liquids.
View equipment guideHDPE / PP chemical tanks
Plastic tanks store compatible reagents and process liquids.
View equipment guideBolted steel storage tanks
Coated panels assemble into large process or storage tanks on designed foundations.
View equipment guideWastewater pipework & fittings
Compatible pipes, fittings and supports convey plant liquids and process air.
View equipment guideLaunders, weirs & baffles
Components distribute flow, collect effluent and guide tank hydraulics.
View equipment guidePlatforms, gratings & equipment lifting
Access structures and lifting arrangements support equipment inspection and removal.
View equipment guideSupply and integration
Share your equipment duty, site location and any existing drawings or specifications. The proposal will identify the selected equipment, supply scope, installation interfaces, performance basis, spare parts and delivery conditions.
Explore related treatment services